The LB5000 Asphalt Mixing Plant is a top-tier, high-capacity machine engineered for the most demanding asphalt production tasks. With an impressive rated capacity of 400 tons per hour, this model is perfectly suited for large-scale infrastructure projects such as highways, airports, and major urban developments, where large volumes of high-quality asphalt are required with maximum efficiency.
Key Features:
Outstanding Production Capacity: The LB5000 is equipped with a massive dryer drum, measuring 3 meters in diameter and 12 meters in length, ensuring exceptional drying and heating performance. This design allows for the continuous production of large volumes of asphalt, making it ideal for extensive construction projects.
Versatile Fuel Options: The burner supports various fuel types, including diesel, heavy oil, coal powder, and natural gas. This flexibility enables the plant to operate efficiently under diverse conditions and fuel availability, optimizing operational costs and enhancing adaptability.
Advanced Environmental Control: To meet stringent environmental standards, the LB5000 is equipped with a Cyclone + Baghouse dust filtering system with an expansive bag area of 1500 square meters. This system effectively captures and filters fine dust particles, ensuring a clean worksite and compliance with environmental regulations.
High-Capacity Mixing Tower: The mixing tower features six hot hoppers with a combined volume of 80 cubic meters, allowing for precise control over material handling. The mixer itself boasts a capacity of 5000 kilograms, ensuring the production of consistent, high-quality asphalt mixtures that meet the exacting standards of large-scale projects.
Extensive Storage Solutions: The LB5000 offers under-storage and side-storage options, with asphalt storage capacities reaching up to 300 tons. This allows for efficient management of large asphalt batches, reducing the frequency of production stops and enhancing overall productivity.
Durable and Reliable Transmission: The LB5000 is equipped with a double gearbox transmission system that ensures smooth, synchronized operation even under the most demanding conditions. This robust design minimizes maintenance needs and maximizes uptime, which is critical for large-scale, continuous operations.
Comprehensive Filler and Bitumen Supply: The plant includes a reclaimed filler silo with a volume of up to 50 cubic meters and a virgin filler silo with an 80 cubic meter capacity. The bitumen supply system supports both electrical heating and diathermic oil heating options, ensuring rapid heating and maintaining the optimal temperature for superior asphalt production.
Designed for the Largest Projects
The LB5000 Asphalt Mixing Plant is engineered for contractors who require a highly reliable and efficient solution for the largest asphalt production projects. Its advanced features, massive capacity, and robust construction make it the ideal choice for delivering top-quality asphalt on a grand scale, meeting the demands of the most ambitious and complex infrastructure projects.
Asphalt Mixing Plant
Configuration and parameters —
Type | LB800 | B1000 | LB1200 | LB1500 | LB2000 | B3000 | B4000 | B5000 | ||
Rated capacity(tph) | 64 | 80 | 96 | 120 | 160 | 240 | 320 | 400 | ||
Cold batcher | Customer's optior | |||||||||
| 3 | 4 | 4 |
|
| 6 | 6 | 6 | ||
Volume/hopper(m³) |
| 8 | 8 | 8 | 8 | 15 | 15 | 18 | ||
Dryer drum diameter(m) | .54-1.74 | 1.75 | 1.75 | 1.95 | 2.25 | 2.5 | 2.7 | 3 | ||
Dryer drumlength(m) | 6.5 |
|
| 8 | 9 | 10 | 10 | 12 | ||
Burmer(dryer drum) | Diesel diesel+heaw oil.coal powder natural aas.oil+aas(customer's option | |||||||||
Power(MW) | 7.9 | 9.8 | 11.8 | 14.8 | 19.7 | 29.6 | 39.4 | 49.4 | ||
Dust fitering | Cyclone+water,cyclone+baghouse | Cyclone+baghouse | ||||||||
Bag area(m) | 320 | 360 | 440 | 510 | 650 | 920 | 200 | 1500 | ||
Mixing tower |
| |||||||||
|
|
| 6 | 6 | 6 | |||||
Volume/HotHopper(m³) |
| 12 | 25 | 28 | 50 | 80 | ||||
Mixer capacity (kg) | 800 | 1000 | 1200 | 500 | 2000 | 3000 | 4000 | 5000 | ||
Transmission | Double gearbox with gear synchronization | |||||||||
Asphalt storage | Under-storage/Side-storage | |||||||||
Volume of under-storage(t) | 30 | 50 | 50/100/200 | 100/150/300 | ||||||
|
| |||||||||
Volume of Reclaimed fler sio(m³) | 12/30 (Under-storage) | 20/40(Under-storage) | 20/50(Under-storage) | 30/50(Under-storage) | ||||||
Volume ofvigin fler silo(m³) | 20 | 30 | 30 | 50 | 50 | 80 | ||||
Bitumen supply | Eectica heatng/fastheatingwithin tank/diahermic oil heaing(coalolgas | Electical heating/diathermic oi heating (coa/oilgas) | ||||||||
Volume oftank(m³) | 1X50 | 2X50 | 3X50 | 4X50 | ||||||
| Electrical heating/diathermic oil heating (coal/oilgas) | |||||||||
Diesel oi tank(m³) | 1X10 | |||||||||
Maximum singe machine power(Kw) | 45 | 55 | 75 | 90 | 110 | 160 | 185 | 220 |